
Media
Our work, straight from site.
40 photos of real rack, fibre, networking and install work by IITECH engineers. No stock photos. Client names, site identifiers and labels are withheld or blurred.
Photo gallery

Data centre rack rowRacking, patching and cable management

Fibre patchingSingle-mode and multimode fibre on top-of-rack switches

Rack cablingServers cabled and dressed down the rack

Vertical cable managementDressed and bundled patching

Console and management portsRouter out-of-band access

Labelled fibre runsEvery lead labelled end to end (labels blurred)

Wall cabinet installPatch panel and switching in a wall-mounted cabinet

Optics prepQSFP transceivers and single-mode leads

Top of rackPDUs and aqua fibre routed overhead

Switch fibre patchingSingle-mode fibre into top-of-rack switches

Structured cablingCopper patching, rack to rack

Comms rack installPatch panels, switching and servers

Active optical cablesAOC leads unpacked and checked before install

Server chassis rackedHardware mounted and ready for cabling (label blurred)

Top-of-rack switchingSwitch install and aqua fibre patching

Console cableSerial console access for switch and router builds

Server hardwareRack servers racked and stacked

Rack buildSwitches installed, fibre routed, label printer on hand

Fibre labellingAqua multimode leads labelled at the switch (labels blurred)

Rack row, overheadCable routing and containment

Labelled A/B powerDual power feeds labelled A1 and B1

Server rack, rearDressed power and network cabling

AOC cable prepActive optical cables checked before install

Office comms rackSwitching, patching and recorder installed

Comms roomSwitching and patching

Fibre trayPatching at the top of a new rack

Hot-swap power and fansRedundant PSUs checked after install

Fibre to the switchSingle-mode leads patched into switch optics

Servers stagedRack servers staged before deployment

ProcurementNetworking hardware delivered to site (labels blurred)

Open rackAqua fibre and PDUs in a new cabinet

Router patchingCopper uplinks patched into a router

Chassis installBlade-style chassis installed below a patch panel

AOC leadAqua active optical cable ready to install

Office network cabinetEquipment install and patching

Server frontRack server installed and powered

Laptop repairMemory and component checks during break/fix

Server rackHigh-density servers in a new cabinet

Hardware break/fixLaptop stripped down for a repair

Office comms roomRack and UPS installed in a small comms room
Have a similar job coming up?Send us photos of the site on WhatsApp and we'll scope it with you.
Send us a WhatsApp
Let's talk
Need hands on site? Let's get it done.
Tell us the site, the task and your time window. An engineer will get back to you, day or night.
+27 78 243 6482hello@iitech.co.zaJohannesburg, Gauteng